Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014-7-29 18:16:55 Read: 3488 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
国产99久久久久久免费看 | 搡老妇女一区二区三区四区 | 女人18毛片A片免费视频小说 | 敌伦交换一区二区三区 | 国产视频无码在线观看 | 搡老妇女一区二区三区四区 | 操逼喷水疯狂视频91 | 人妻精品久久无码区新狼窝 | 91精品国产92久久久久无码观看 | 7777kkk亚洲综合欧美网站 | 青青青的成人免费视 | y111111国产精品久久婷婷 | 国产一国产精品一级毛片 | 无码精品人妻一区二区三区网站 | 国产精品粉嫩萌白酱白丝 | 国产欧美大屁股喷水无码视频 | 亚洲午夜福利在线观看 | 果酱短视频成人版黄A片 | 丰满人妻熟女中文字幕AⅤ 一级做a爰片久久免费观看 | 国产老熟女精品久久久久影院黑人 | 国产精品污www在线观看 | 日产精品无码一级毛片 | 国产人妻人伦精品无码.麻豆 | 色欲天天婬色婬香综合网图片 | 午夜亚洲AⅤ无码高潮片苍井空 | 精品免费国产一区二区三区四区 | 又粗又硬又黄A级毛片伊人久 | 情趣色诱免费视频在线观看 | 四虎成人影视8848亚洲 | 国产五级婬片A片免费 | 中文字幕无码久久精品青草 | 熟女人妻のav中文字幕精品图集 | 九一久久亚洲欧美精品午睡沙发 | 女性无套 免费网站在线看麻豆 | 亚洲V国产v欧美v久久久久久 | 亚洲午夜粉色无码区毛片 | 人妻妺妺窝人体色WWW聚色窝 | 波多野结衣乳巨码无在线免费 | 精品国产乱码久久久久电车痴汉久 | 精品人妻久久久久一区二区三区 | 特级西西人体高清大胆的功能介绍 |